7. Place the LPCA bracket into position on the frame cross member bracket and secure
using the two 4 mm hex key bolts (2x) and washers (2x). Fully tighten the fasteners.
8. Reconnect the Strain Gauge (J1) cable connector, then the Data COMM (J3) cable
connector and last the Generator (J5) ,cable connector.
Contact Precor Customer Support at [email protected] or 800.786.8404 with
any questions.
Page 94
5 Replacement Procedures
Drive Belt, Generator Belt, and Flywheel Replacement