![Precor SBK800-16 SPINNER Service Manual Download Page 82](http://html.mh-extra.com/html/precor/sbk800-16-spinner/sbk800-16-spinner_service-manual_1594855082.webp)
3. Disconnect the Data COMM, Strain Gauge, Battery, and Generator cables. Use a pen
or tape to mark the Data COM and Strain Gauge cables at the lower fork push mount
cable tie.
Note
: Alternatively you can measure and record the Data COMM cable and Strain
Gauge cable lengths from the LPCA connectors to the right fork lower push-mount
cable tie. The reference marks (or measured cable lengths) will be used during the
installation process.
4. Remove the flywheel which requires removing the LPCA board, the cross member,
drive belt, and generator belt, see
"Drive Belt, Generator Belt, and Flywheel Replace-
Contact Precor Customer Support at [email protected] or 800.786.8404 with
any questions.
Page 74
5 Replacement Procedures
Data COMM Cable Replacement