MPS6100 OPERATION MANUAL
ORIGINAL INSTRUCTIONS
Page 7
CAUTION: This assembly weighs in total over 28 kilograms, please use a minimum of two
people to remove this from the box and to mount in its final position.
2.1
UNCRATING THE MPS6100 SERIES
1)
Open the box then remove the first layer of plastic wrap and foam to uncover the head
and rails. Carefully lift the head and rails out of the box and set aside.
2)
Remove the second layer of wrap and foam to uncover the two stand sections the base
and the stem. Remove each component separately and set aside.
2.2
ASSEMBLING THE MPS6100 SERIES
1)
The stand must first be assembled. To do so, remove the four supplied screws that are
attached in the top section of the stand.
2)
Once the screws are removed, place the stem of the stand into the base section as shown
in Figure 3.
3)
Replace the screws to attach the stem to the base, tightening firmly into place.
4)
Next, the sealing head must be attached to the stand. Simply place the upper two support
pins on either side of the control box into the upper slots on the stand. Next, gently swing
the sealing head down into place. The sealing head will be attached as shown in Figure 5.
5)
Install the locking bolts to ensure the sealing head is held securely in place.
6)
Plug in the connectors for the sealer motor and conveyor, if applicable, as shown in Figure
2-3.
7)
Options requiring external I/O’s can be plugged into the X2X bus and power connectors
shown in Figure 2-3.
Summary of Contents for MPS6100
Page 6: ...MPS6100 ORIGINAL Page vi ISO SAFETY SYMBOLS LOCATION...
Page 7: ...MPS6100 OPERATION MANUAL ORIGINAL Page x MPS6100 OPERATION MANUAL...
Page 27: ...MPS6100 MAINTENANCE MANUAL ORIGINAL Page xii MPS6100 MAINTENANCE MANUAL...
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......