82 . Frontier IR Dual-Range Systems User's Guide
8.
Ensure the cover is fully open and retained by the stay.
9.
Perform the necessary maintenance inside the instrument.
Figure 45 illustrates the primary component parts of a Frontier IR Dual-Range
spectrometer.
Figure 45 Frontier IR FT-IR/NIR components
NOTE: The Frontier FT-IR/FT-FIR spectrometer has one source only, in the MIR source
position. The FIR detector is in the NIR detector position.
NOTE: If you have an MCT detector fitted for the MIR range, the MCT detector is fitted
toward the rear of the instrument and the NIR/FIR detector is fitted at the front of
the instrument.
10.
Close the cover.
11.
Lock the two locking bolts by inserting the wrench into each bolt in turn and rotating it
opposite to the direction indicated by the arrows in Figure 44.
12.
If required, reinstall the sampling accessory by sliding it on the ledge and pushing it into
the sample compartment until it engages with the connector.
13.
If required, refit the sample cover by inserting the hinge into the grooves and pushing
the cover downwards until the clip engages.
14.
Reconnect the power cable and switch the power back on.
15.
If required change the desiccant (see
on page 65), and/or
purge the instrument (see
Spectrometer on page 70).
If the cover is left open for more than 1 hour, the desiccant should be replaced.
MIR source
Laser
Laser power supply
Beamsplitters; within
interferometer and
carrier
MIR
detector
NIR source
Power supply
NIR
detector
MIR source
NIR source
Laser power supply
Power supply
Laser
NIR
detector
MIR
detector
Beamsplitters; within
interferometer and
carrier
Summary of Contents for Frontier IR
Page 1: ...FRONTIER IR DUAL RANGE SYSTEMS User s Guide MOLECULAR SPECTROSCOPY...
Page 5: ...Introduction...
Page 10: ...10 Frontier IR Dual Range Systems User s Guide...
Page 11: ...Warnings and Safety Information...
Page 23: ...An Overview of the Frontier IR Dual Range Spectrometers...
Page 34: ...34 Frontier IR Dual Range Systems User s Guide...
Page 35: ...Unpacking and Installation...
Page 45: ...Using the Spectrometer with Spectrum...
Page 52: ...52 Frontier IR Dual Range Systems User s Guide Figure 21 Atmospheric suppression...
Page 57: ...Routine Maintenance...
Page 78: ...78 Frontier IR Dual Range Systems User s Guide...
Page 79: ...Advanced Maintenance...
Page 94: ...94 Frontier IR Dual Range Systems User s Guide...
Page 95: ...Appendices...