69
Pressure Calibration
Figure 5-12.
The Digestion Finished screen
2. When the digestion has completed, the Titan MPS will display the
Digestion
Finished
screen. On this screen, the digestion comment can be edited to
include new information by pressing the text field. The digestion data can be
reviewed in greater detail by pressing the
Review Digestion
button (see Data
Review File Management and Export on page 84). You can press
Finish
to
return to the
Home
screen
Pressure Calibration
Creating a Pressure Calibration for a DPC Cap.
From the
Home
screen, press the
Method
button. This will open the
Select
Method
screen. On the
Select Method
screen are the 10 favorites to choose from,
and at the bottom select the
Pressure Adjust
button.
Note
This is typically performed by the PerkinElmer service engineer, but
appears here to provide a reference for the user.
Summary of Contents for TITAN MPS
Page 1: ...TITAN MPS Customer Users Guide ATOMIC SPECTROSCOPY ...
Page 2: ......
Page 3: ...Titan MPS Users Guide ...
Page 55: ...45 Power Cord Options Buck and Boost Transformer 0 5 KVA Japan and U S Canada Connections ...
Page 98: ...88 Operation Figure 5 27 Sample Details review 1 8 Figure 5 28 Sample Details review 9 16 ...
Page 104: ...94 Operation Sample Details Entering individual sample information ...
Page 105: ...95 Digestion Results Digestion Results Reviewing the data from completed digestions ...
Page 109: ...99 Data Management Data Management Options available via the Data button on the Home screen ...
Page 120: ...110 Maintenance ...
Page 122: ...112 Maintenance ...
Page 132: ...122 Appendix Login Login 1 Select the login access desired ...
Page 133: ...123 Index of Controller Screens Login Passcode 1 Enter the login passcode ...
Page 156: ...146 Appendix ...
Page 160: ......