APPENDIX B
IPA Hardware Installation Guide
105
This applications note clarifies the connections with the IForce and Ripped series motors and positioners to the
IPA. IForce and Ripped coils and positioners can be supplied with flying lead cables, covered in this appendix. For
positioners with the connector box, see “Appendix C.”
IForce/Ripped to IPA-Controller Wiring
The IForce and Ripped coils have different color codes based upon the wiring option (such as WD3 or WD7 in
the part number). The IForce positioners (T1, T2, T3 and T4) use coils with WD2 wiring option, a separate
MHED module that includes optical limits/ home sensors and magnetic hall-effect feedback, and the encoder
readhead and scale. The Ripped positioners (TR07, TR10, TR16) use HED connector modules that include both
magnetic limits/home and hall-sensors feedback, and encoder readhead and scale.
In 2008 Parker began changing wire color codes, both old and new are shown for reference.
T1, T2, T3 Positioners/110, 210, 310 Coils with Options WD0/WD1/WD2/WD7
Old Color Codes
New Color Codes
IPA Motor Pin
Red
Red/Yellow
U
Blue
Blue/Yellow
White
White/Yellow
V
Green
Violet/Yellow
Black
Black/Yellow
W
Brown
Brown/Yellow
Drain (coils)
Green/Yellow (Positioners)
Green/Yellow
Ground
T4, TR7, TR10, TR16 Positioners/R7, R10, R16, 410 and ML50 Coils/110, 210, 310 Coils with Options
WD3/WD4
Old Color Codes
New Color Codes
IPA Motor Pin
Red
Red/Yellow
U
Brown
Brown/Yellow
V
Orange
Orange/Yellow
W
Drain (coils)
Green/Yellow (Positioners)
Green/Yellow
Ground
Summary of Contents for IPA Series
Page 2: ......
Page 14: ...INTRODUCTION 14 IPA Hardware Installation Guide CHAPTER 1 Introduction...
Page 18: ...MECHANICAL INSTALLATION 18 IPA Hardware Installation Guide CHAPTER 2 Mechanical Installation...
Page 24: ...ELECTRICAL INSTALLATION 24 IPA Hardware Installation Guide CHAPTER 3 Electrical Installation...
Page 54: ...TROUBLESHOOTING 54 IPA Hardware Installation Guide CHAPTER 4 Communications...
Page 63: ...TROUBLESHOOTING IPA Hardware Installation Guide 63 CHAPTER 5 Troubleshooting...
Page 77: ......
Page 100: ...REGULATORY COMPLIANCE UL AND CE 100 IPA Hardware Installation Guide...
Page 101: ......
Page 102: ...APPENDIX A 102 IPA Hardware Installation Guide APPENDIX A VM25 Expansion Module...
Page 114: ...APPENDIX C 114 IPA Hardware Installation Guide APPENDIX C IPA with Parker Mechanics...