
SET UP MASTER/SLAVE OPERATION
1. Use a Gig-E cable to connect the GIG-E port on one camera to the GIG-E port on the other camera.
2. On the Master camera, follow the instructions below:
A. Go to Menu > Network > Camera.
B. Type a name for the camera (Example: CAM A, LEFT, MASTER, etc) in the Camera ID field.
C. Set Target to All.
Figure: Set Target to All
D. Go to Menu > Network > Ethernet.
E. Enable Camera to Camera.
Figure: Set Target to All
COPYRIGHT © 2017 PANAVISION INTERNATIONAL, L.P.
FW: V-0.5.35
|
117
PANAVISION MILLENNIUM DXL
Summary of Contents for Millennium DXL
Page 1: ...PANAVISION COM...