182
Configuring the Hybrid GHP/EHP
control
Setting
Setting cost priority control
[Cost settings]
Make settings for power and gas costs used in cost priority control.
A day can be divided into a maximum of 5 time slots, and operation is optimised according to the power
costs and gas costs set for each time slot.
y
The values set for power costs and gas costs are used when calculating the ratio of power charges and
gas charges when using cost priority control.
This means that it doesn’t matter what the currency is, but it is necessary to match the scale of the
monetary value.
4
Put a check mark in the “Valid” column.
z
Select the time slot to use.
4
5
Set the power costs/gas costs.
z
The touchscreen numeric keypad appears when you touch
the text box.
5
Item
Explanation
Pow costs (cost/
kWh)
Set the unit price (0 to 999.99) for each
unit of energy.
This is used to calculate the power
charges when using cost priority
control.
Gas costs (cost/
kWh)
Set the unit price (0 to 999.99) for each
unit of energy.
This is used to calculate the gas
charges when using cost priority
control.
Continued on next page
1
Touch [System Settings] in “Settings”.
z
The “System settings” screen is displayed.
1
2
Touch [Hybrid GHP/EHP settings].
z
Enter the identification number (password level 1 or 2) and
the “Hybrid GHP/EHP settings” screen is displayed.
2
3
Touch [Cost settings].
z
The “Cost settings” screen is displayed.
3