152
Configuring the system
Setting
8
Touch [Register].
z
To cancel the settings, touch [Cancel].
8
6
Touch [Register].
z
The “Edit schedule group settings” dialogue closes.
z
To cancel the settings, touch [Cancel].
6
7
Put a check mark in the “Valid” column.
z
Put a check mark in the schedule group to be used for the
operating schedule.
7
The “Set schedule group name” screen
A: Put a check mark in the group to be edited.
B: Put a check mark here if schedule group is to be
used.
C: The indoor units belonging to the selected
schedule group are displayed.
D: The “Edit schedule group settings” dialogue is
displayed when you touch this.
A
B
C
D
Changing the name of the schedule group