3 Operation
Grid Connect Photovoltaic Inverter KP100L-OD-
USER’S MANUAL
3-5 Mo
de Select
ion
Disp
lay
3
9
[15] Clear of Total Periodic Energy
Clear of Total Periodic Energy to 0.
[Operational Procedure]
At first, after showing the item name of "TotalClr" by you push the "<<" and ">>" key, push the ENT key. When
you push the ENT key and the MODE key at the same time for 5 second after the display became the execution
confirmation "Are you ready?", the integral power consumption clear is executed. The display becomes the
execution completion after continuing the display executing integral power consumption clear for 5 second. After
that, the display returns to the item selection after 3 second pass.
Moreover, when you push the MODE key while displaying the execution confirmation, the display returns to the
item selection without you do clear of Total Periodic Energy.
[16] Auto Test (ITA only)
Confirm each function of the OV(Over Voltage), UV(Under Voltage), OF(Over Frequency) and UF(Under
Frequency).
Refer to" 3-6 Procedure of the Auto Test".
Setup:TotalClr
Are you ready?
Setup:TotalClr
ENT
Setup:TotalClr
Executing
MODE
Setup:TotalClr
Complete
for 5 second
Push the ENT+MODE key
After 5 second pass
Blinking the Display[3]
After 3 second pass
Summary of Contents for KP100L-OD - 12-2010
Page 18: ...17 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 21: ...20 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 33: ...1 Overview 1 12 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 63: ...2 Design 2 30 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 103: ...4 Maintenance Operations 4 12 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Page 113: ...6 After Sales Service 6 4 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Page 117: ...7 Specifications 7 4 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Page 125: ...A Appendix A 8 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...