3 Operation
3 - 26
Grid Connect Photovoltaic Inverter KP100L-OD-
USER’S MANUAL
Error of Auto Test
The measurement becomes impossible when the power failure etc. occur, the LCD display shows "Example 1" ,
so the Auto Test error "E5-9 AutoTestFault" occurs, and KP100L stops. Afterwards, you can execute Auto Test
again according to the procedure of
"The starting procedures for auto test"
.
[Examle 1]
Change of Set Value
The detect level of OF/UF can be changed according to the detect level change menu of the user setting as
follows. The setting should be 0 (OF is 50.50Hz and UF is 49.70Hz) as default.
You don't allow to change setting to 1 without ENEL agreement. You can only change setting by indication of
ENEL personnel as described in ENEL gideline.
Setting of Germany
This section explains the setting when the country setting is Germany.
Change of Detect level
The detect level of OV can be changed according to the detect level change menu of the user setting as follows.
You can only change setting in consultation with grid operator
Setting
OF/UF Detect level
0
50.30Hz (OF-Detect level)
49.70Hz (UF-Detect level)
1
51.00Hz (OF-Detect level)
49.00Hz (UF-Detect level)
Setting
OV Detect level
0
253.00V
1
264.50V
AutoTest:UF
- - - / - - -
Summary of Contents for KP100L-OD - 12-2010
Page 18: ...17 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 21: ...20 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 33: ...1 Overview 1 12 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 63: ...2 Design 2 30 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 103: ...4 Maintenance Operations 4 12 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Page 113: ...6 After Sales Service 6 4 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Page 117: ...7 Specifications 7 4 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Page 125: ...A Appendix A 8 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...