9
Grid Connect Photovoltaic Inverte KP100L-OD-
USER’S MANUAL
Precautions for Safe Use
To use the product safely, what is executed or should evaded is shown.
Installation
Put the space of 200mm or more between the following.
•
Between the product and the ceiling or eave
•
Between the product and the floor
•
Between the product and right and left wall
When you install the multiple KP100L, put the space of 200mm or more on the side of each KP100L.
Do not install the multiple KP100L vertically.
Do not install in the location where the product receives direct sunlight or rain when you install in outdoor.
Do not install the product in the home or near the place where the person work because the audible noise
generates when the product is oparating.
Transporting
Provide sufficient safety measures, such as scaffolding, to prevent danger during installation work.
Installation and Wiring
Make sure the following points when you install the product.
(1) Use the accessories included with KP100L.
(2) Make sure there is neither danger nor malfunction by the peripheral and the wire, etc.
other than the accessory.
•
When wiring to the AC terminal block, do not insert two or more wires into one terminal.
•
Use the wire of the diameter that corresponds to the capacity of the Solar modules.
Fire or smoke from fire may occur.
•
IP65 performance can not be provided, if you don't follow these instructions:
(3) Use the cable of
18.5-20.5mm when you use the rubber bush of one hole for the AC cable clamp.
(4) Use the five cables of
3.5-4.0mm when you use the rubber bush of five holes
for the AC cable clamp.
(5) Use the cable of
4mm for the communications cable and the AUX cable.
(6) Tighten the cable clamp.
(7) Tighten the screws of the cover foreside R by tightening torque 1.5-1.7 N
m.
(8) Make sure the wire doesn't come off the terminal block after wiring the communication wire and the
AUX wire to the terminal block.
Exchanging Fans (FAN Assembly)
Make sure the following precautions when exchanging FAN Assembly.
(1) Exchange the FAN Assembly after turning off the breaker of the grid side and the Solar module side
and 3 minute or more pass. Electric shock and injury may occur.
(2) Use the specified FAN Assembly.
(3) Make sure the mounting direction of the FAN Assembly
(4) Tighten the screw correctly by tightening torque 1.5-1.7N
m after exchanging FAN Assembly.
(5) Connect each connector of the FAN Assembly to the product correctly.
Summary of Contents for KP100L-OD - 12-2010
Page 18: ...17 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 21: ...20 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 33: ...1 Overview 1 12 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 63: ...2 Design 2 30 Grid Connect Photovoltaic Inverte KP100L OD USER S MANUAL ...
Page 103: ...4 Maintenance Operations 4 12 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Page 113: ...6 After Sales Service 6 4 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Page 117: ...7 Specifications 7 4 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...
Page 125: ...A Appendix A 8 Grid Connect Photovoltaic Inverter KP100L OD USER S MANUAL ...