Whenever possible, route I/O wiring through wiring ducts. Install the ducts so that it is easy to wire the
I/O Units through the ducts. It is handy to have the ducts at the same height as the Racks. Use mount-
ing bases if necessary to adjust the heights.
Precautions for Correct Use
Precautions for Correct Use
Tighten terminal block screws and cable screws to the following torques.
M4: 1.2 N·m
M3: 0.5 N·m
z
Routing Wiring Ducts
Install the wiring ducts at least 20 mm between the tops of the Racks and any other objects, (e.g.,
ceiling, wiring ducts, structural supports, devices, etc.) to provide enough space for air circulation
and replacement of Units.
Using Wiring Ducts
40mm
30mm
30mm
81.6~89.0mm
CPU
Rack
Mounting bracket
Duct
Duct
Duct
Unit
20mm min.
20mm min.
DIN Track
Input duct
Output duct
Power duct
200 mm min.
CP1E
Breaker
Fuse
Power
equipment,
such as
transformers
and magnetic
relays
Terminal blocks
for power
equipment
Terminal
blocks for
PLC
Fuses, timers,
relays, etc.
(Not heat-
generating
equipment or
power
equipment.)
Summary of Contents for CP1E-E10DT-A
Page 3: ......
Page 31: ...26 CP1E CPU Unit Hardware User s Manual W479...
Page 273: ...Index 4 CP1E CPU Unit Hardware User s Manual W479...
Page 275: ...Revision 2 CP1E CPU Unit Hardware User s Manual W479...
Page 276: ......