-
57
-
GENERAL MAINTENANCE
K JAW BLADE MAINTENANCE AND ADJUSTMENT
STEP 4:
Verify the clearance (d66) between the lead edge of the piercing tip (DG) and tunnel
blade (DB). This clearance should be approximately .15”
(3.81 mm)
to .19”
(4.83 mm)
.
Install tunnel blade shims if necessary to achieve the above clearances.
After blade shimming is complete, remove the socket head cap screws (OO) for the
tunnel blade and apply thread adhesive. Then torque to NPK specifications (see the
“FASTENER TORQUE CHART”
).
STEP 5:
The female jaw (BI) also has two guide blades (DF) and two spacer plates (DE). The
blades are located directly across from each other. Install either reconditioned (used) or
new guide blades into the guide blade pockets (DM) then tighten the socket head cap
screws (OO).
Summary of Contents for M35G
Page 13: ... 13 SERIAL NUMBER LOCATION M35 ...
Page 115: ... 115 WARRANTY STATEMENTS ...
Page 116: ... 116 WARRANTY STATEMENTS ...