-
67
-
FRAME MAINTENANCE
REPAIR OF MAIN FRAME
ROUTINE WELD REPAIR
7. Allow area to cool slowly
(eight hours minimum)
. Cover with a heat blanket or other
suitable insulation.
FAILURE TO DO SO MAY CAUSE CRYSTALLIZATION OF
THE WELD AND SUBSEQUENT BREAKAGE
.
NOTE:
NPK Construction Equipment has developed this repair procedure based on
known information about structure and material. This, however, does not imply that
repairs made using this procedure are guaranteed to be successful. NPK, therefore,
cannot warranty this procedure. There is
NO
warranty regarding this repair either
expressed or implied.
Summary of Contents for M35G
Page 13: ... 13 SERIAL NUMBER LOCATION M35 ...
Page 115: ... 115 WARRANTY STATEMENTS ...
Page 116: ... 116 WARRANTY STATEMENTS ...