-
98
-
TROUBLESHOOTING
2. M35 MATERIAL PROCESSOR RELIEF VALVE
After the M35 Material Processor hydraulic circuit has been verified, check the M35
Material Processor relief valve settings for both open and close.
A. With a 0 – 5000 psi
(350 bar)
gauge installed in both the open and close side of
the stick, open the shut-off valves.
B. Start the carrier. Set the throttle at full RPM and close the jaws completely and
hold for 10 seconds. Check the psi
(bar)
reading on the gauge and compare to
the specified M35 Material Processor relief valve setting. If it is not the same,
reset the M35 Material Processor relief valve accordingly.
C. The booster will start to click. Depending on oil temperature, the booster will
continue to click slowly compensating internal leaking in the main cylinder. This
is normal.
D. If the intensifier is clicking rapidly, pressure may not reach the relief valve setting
due to severe intensifier or cylinder leakage.
E. Open the M35 Material Processor jaws to the fully open position and hold for 10
seconds. Check the pressure reading on the gauge and compare to the
specified M35 Material Processor relief valve setting. If it is not the same, reset
the M35 Material Processor relief valve accordingly.
PRESSURE INTENSIFIER SEQUENCE VALVE AND RELIEF
VALVE ACTUATION
Close the jaws without material in them. When the M35 Material Processor’s cylinders
are fully stroked, the load pressure rises until it reaches the M35 Material Processor’s
(GX) relief valve setting (P2). The excavator relief valve acts only as a safety relief and
must be set a minimum of 200 psi
(14 bar)
above the M35 Material Processor relief
valve setting shown below.
MODEL
SERIAL
NO.
P2
P3
M35
PROCESSOR
MINIMUM
CARRIER
RELIEF
VALVE
RELIEF
VALVE
SETTING
SETTING
psi
(bar)
psi
(bar)
M35
ALL
3,700
(255)
3,900
(270)
Summary of Contents for M35G
Page 13: ... 13 SERIAL NUMBER LOCATION M35 ...
Page 115: ... 115 WARRANTY STATEMENTS ...
Page 116: ... 116 WARRANTY STATEMENTS ...