7. Joystick straight to the left = both left-hand side outriggers up/down
8. Joystick to the upper left corner = left-hand side front outrigger up/down
- Lower all outriggers and lift the Access Platform to be supported by the outriggers. Once
all ground sensors have activated, the horizontal position lights (14) in the control panel
switch on.
- Press the push-button (5) for automatic setting of horizontal position, whereby the
horizontal position is set automatically. Once horizontal position has been reached, all
horizontal position lights are lit and the display shows text "boom drive accepted". If the
setting of horizontal position does not succeed, an error light (19) will be lit, and the
display shows text "autoleveling failure! – use manual controls".
- Setting the horizontal position manually: If the automatic setting of horizontal position
does not succeed or if you wish to use manual setting, carry out the setting of horizontal
position on the basis of the horizontal position lights. The lights indicating the higher sides
of the Access Platform will be lit. After this, raise that side of the Access Platform where
the lights are not on. Once all lights are lit, the display shows text "boom drive accepted".
- Once the lifting boom is lifted off the transport support, the indicator lights go off.
Note! The indicators for horizontal position DO NOT PREVENT the use of boom even if
the Access Platform is not in horizontal position.
THE OPERATOR IS ALWAYS RESPONSIBLE FOR PROPER OPERATION!
11.1
USE OF BOOM
- Set the Access Platform to be supported by the outriggers in accordance with the
instructions given under item Use of outriggers.
- Press the pedal (17) and lift the boom section off the transport support by using the left-
hand side joystick (1).
FUNCTIONS:
BOOM UP
EXTENSION IN
SLEWING
SLEWING JIB
JIB
LEFT
RIGHT
IN
OUT
BOOM DOWN
EXTENSION OUT
LEFT JOYSTICK
RIGHT JOYSTICK
Guide the boom to the desired working area by using both joysticks. If necessary, you can
use four simultaneous movements.
22
Summary of Contents for XS240
Page 1: ...XS240 SELF PROPELLED TELESCOPIC PLATFORM OPERATION MAINTENANCE...
Page 6: ...XS 240 SELF PROPELLED TELESCOPIC PLATFORM 4 SPECIFICATION Figure 3 Specification 5...
Page 10: ...XS 240 SELF PROPELLED TELESCOPIC PLATFORM 5 1 NOSTOLIFT XS 240 BOOM GEOMETRY 9...