Installation
3-1
3 Installation
3.1 Overview
This section describes installation procedures for the Spectrum S2-900 Series Dispensing System and
covers the following topics:
•
Uncrating and Placing the Dispensing System
•
•
Unpacking the Dispensing Chamber
•
Installing the Laptop Computer
•
Leveling the Dispensing System
•
Anchoring the Dispensing System
•
Setting Up the Service Station
•
Connecting the Power and Air Supply
3.2 Safety First
Operation of your S2-900 Series Dispensing System involves heat, air pressure, electrical power,
mechanical devices, and the use of hazardous materials. It is essential that every person servicing or
operating the dispensing system fully understands all hazards, risks, and safety precautions. Refer to
for additional information.
WARNING!
Installation procedures should only be performed by a trained service technician.
3.3 Facility Requirements
To ensure optimal performance and safety, it is necessary to install the dispensing system in a facility that
meets the requirements. If you have any questions about facility requirements, please contact Nordson
AYSMTEK Technical Support. See
3.4 Tools and Materials Needed
•
3 mm hex key
•
1/2-inch wrench
•
9
∕
16
-inch wrench
•
Phillips Screwdriver (included in tool kit)
•
Band Cutter
•
1 ½-inch wrench (included in tool kit)
•
Personal Protective Equipment
•
Diagonal-cut pliers
•
Hammer
•
Forklift
•
Flat Bar
•
Box Level
Summary of Contents for Spectrum II S2-900 C Series
Page 2: ......
Page 36: ...1 22 Introduction 1 11 8 Rear View Open Figure 1 9A S2 900 Rear View Open 1 2 3 4...
Page 40: ......
Page 124: ......
Page 157: ...Calibration and Adjustment 5 33 Figure 5 38 Dispense Lift Table Controls...
Page 159: ...Calibration and Adjustment 5 35 Figure 5 40 Beacon Configuration Window...
Page 186: ......
Page 197: ...Troubleshooting 7 11 Figure 7 1 Scale Setup Menu Figure 7 2 Scale Error Message...
Page 200: ......
Page 215: ...Parts Replacement 8 15 Figure 8 11 Replacing a Panel Mounted Fuse...
Page 218: ......
Page 223: ...Specifications 9 5 Top View mm Back View mm Figure 9 2 S2 900 System Dimensions 2 of 2...
Page 225: ...Specifications 9 7 Top View mm Back View mm Figure 9 4 S2 9XXC System Dimensions 2 of 2...
Page 228: ...A 2 Appendix A Material Safety Information A 2 1 Multemps PS NO 2...
Page 229: ...Appendix A Material Safety Information A 3...
Page 230: ...A 4 Appendix A Material Safety Information...
Page 231: ...Appendix A Material Safety Information A 5...
Page 232: ...A 6 Appendix A Material Safety Information...
Page 233: ...Appendix A Material Safety Information A 7...
Page 235: ...Appendix A Material Safety Information A 9...
Page 236: ...A 10 Appendix A Material Safety Information...
Page 237: ...Appendix A Material Safety Information A 11...
Page 238: ...A 12 Appendix A Material Safety Information...
Page 239: ...Appendix A Material Safety Information A 13...
Page 240: ...A 14 Appendix A Material Safety Information...
Page 246: ......
Page 252: ......
Page 258: ......