System Setup
3-5
Part 1604857-04
E
2014 Nordson Corporation
VBF System Setup
This procedure applies to mobile systems with a vibratory box feeder.
1. Unpack the pickup arm, collar and set screw, pickup tube, and pump.
2. See Figure 3-5. Install the pickup arm as shown, using four M5 x 10
screws with integral washers (3).
1
2
3
Figure 3-5
Pickup Arm Installation
1. Arm
2. Arm bracket
3. M5 x 10 screws (x 4)
3. See Figure 3-6. Install the collar (1) on the pickup tube (2) as shown.
Tighten the socket-head screw to secure the collar.
1
2
3
4
Figure 3-6
Collar Installation on Pickup Tube
1. Collar
2. M5 socket head screw (black)
3. Pickup tube
4. Pump mount
Summary of Contents for Encore LT
Page 4: ...Change Record ii Part 1604857 04 E 2014 Nordson Corporation ...
Page 12: ...Safety 1 4 Part 1604857 04 E 2014 Nordson Corporation ...
Page 34: ...System Setup 3 18 Part 1604857 04 E 2014 Nordson Corporation ...
Page 56: ...Troubleshooting 5 8 Part 1604857 04 E 2014 Nordson Corporation ...
Page 68: ...Repair 6 12 Part 1604857 04 E 2014 Nordson Corporation ...
Page 86: ...Parts 7 18 Part 1604857 04 E 2014 Nordson Corporation ...
Page 87: ...Wiring Diagram 8 1 Part 1604857 04 E 2014 Nordson Corporation Section 8 Wiring Diagram ...
Page 88: ...Wiring Diagram 8 2 Part 1604857 04 E 2014 Nordson Corporation ...
Page 92: ...ZONE REV DESCRIPTION BY CHK RELEASE NO DATE SEE SHEET 1 FOR REVISION HISTORY ...