![Niveo NR-70 User Manual Download Page 97](http://html1.mh-extra.com/html/niveo/nr-70/nr-70_user-manual_1696836097.webp)
}
Figure 7-2 Schedule Settings
Schedule Name:
Specify a unique name for the schedule.
Effective Date Range:
Specify the effective date range for the schedule.
Time Period 1
~
Time Period 3:
Specify further constraints of active time within
the specified date range.
7.2
Application Control
This section describes
APP Control > Application Control
page, you can configure
and view application management list. An application control entry consists of a date,
and application.
1)
Application Management List
In
App Control> Application Control
page, you can enable or disable Internet
application management, and you can add, view, modify, and delete Internet
application management policies in
Application Management List
.