© 2021 Copyright Newmar Corporation. All rights reserved. For the most up-to-date version of this content, and for more product-specific information, please refer to Newgle.
97
ELECTRICAL
LIQUID CRYSTAL DISPLAY (LCD)
The LCD on the faceplate or remote provides the
following information.
Information Type
Display Value / Range
Current from PV Array or DC Load
0 to 85 amps DC (in whole numbers only)
Battery Voltage
4 to 100 volts DC (in 0.2 volt increments)
Watts
0 to 3,600 watts (volts x amps)
Amp hours
0 to 65,536 Ah; can be reset to 0
Total amp hours
0 to 65,536 Ah; resets to zero when
power is disconnected
Status LED
green, red, or orange
AMP-HOUR RESET AND BACKLIGHT
BUTTON
The amp-hour meter on the faceplate or remote can be
reset by two di
ff
erent methods.
Automatic resetting occurs when the C-Series
Multifunction DC Controller is first connected and
activated and each time it’s disconnected from the battery
or the meter cable.
To manually reset the amp-hour meter, press and hold
the push-button on the front of the meter until the display
resets.
This button also activates or deactivates the backlight for
the LCD when pressed and released immediately.
LED STATUS INDICATOR
The multicolor LED indicates the operating status of the
controller. A color-coded label is included on the cover
of the controller explaining the status LED’s indications.
It blinks green, red, or orange depending on the status
of the system. The sequence of the flash also changes
depending on the operation of the controller at that time.
Controller (C60)
The C-Series controller (all models) has one multicolor
LED status indicator and one reset button.
LED STATUS INDICATOR
The multicolor LED on the base unit, or the optional
CM faceplate or CM/R remote, indicates the operating
status of the controller. A color-coded label is included
on the cover of the controller explaining the status LED’s
indications.
1. When in Charge Control mode, the LED will be green.
2. When in Load Control mode, the LED will be red.
3. When an Error Condition exists or the load has
disconnected, the LED will be orange.
4. When battery equalization is in process, the LED
alternates between red and green.
RESET SWITCH
Use the Reset Switch on the side of the chassis for the
following conditions.
•
To manually initiate battery equalization in Charge
Control mode, press and hold the Reset Switch until
the red and green LED start to flash.
•
To manually suspend battery equalization in Charge
Control mode, press and hold the Reset Switch until
the red and green LED stop flashing.
•
To reset following an error
condition, press and release
the Reset Switch.
•
To reset following a low-
voltage disconnect, press and
release the Reset Switch.
The green and red color of the LED only indicates the
particular operating mode and the battery voltage
level. It does not indicate whether the charging
source is functioning properly.
IMPORTANT
!
Source(s): C-Series Multifunction DC Controller Owner’s Manual and
C-Series Meter Display Installation Guide
Product(s): Xantrex Solar Charger Remote (Model: C40R-100, Newmar
Part Number: 122428) and Xantrex Solar Controller (Model: C60, New-
mar Part Number: 122427)
Summary of Contents for VENTANA 2022
Page 1: ...SM 2022...