NV-600WI Managed Industrial Grade Wireless VDSL2 Router USER’S MANUAL Ver. A2
107
When you test the OAM Configuration, the F5 result is displayed as shown in
Figure
4.6.9.1
and this may be a failure or successful
OAM F5 result.
Figure 4.6.9.1 Test Successful
Figure 4.6.9.2 Test Failed
The screen contains the following details: