Chapter VI Installation and
Commissioning of Equipment
6.1 Equipment installation
This equipment is mainly divided into two parts, namely control system and image
acquisition system. The equipment has been installed before leaving the factory. It is only
necessary to confirm that all signal lines of the control system and image acquisition system have
been correctly connected. Turn on the equipment after adjusting the level. Correct the light
source and camera parameters.
6.2 Level adjustment
After the equipment is moved to the destination and the specific placement position of the
equipment is determined, the level of the equipment must be adjusted first. Correct adjustment of
the level can make the equipment run more smoothly, with less noise and longer service life.
The steps for adjusting the equipment level are as follows:
Suspend the four foot cups of the equipment and push it onto the wire body with casters.
Ensure that the front rail of the equipment and the front rail of the front machine are on the
same longitudinal line. Then adjust the foot cup downward to make the casters suspended,
and raise the rail to make it on the same level as the rail of the front machine.
Adjust the front, back, left and right levels of the equipment. At the same time, confirm that
the reference of the equipment track and that of the front machine track are consistent on the
longitudinal line and horizontal plane.
If tools such as wooden stick are used to pry the equipment to slightly move it, please make
sure that the wooden stick is in contact with the steel frame at the bottom of the equipment
and is not contacted with the equipment casing. Otherwise, the casing will be damaged and
even be deformed by forced pry.
The track width can be adjusted to the same as that of the front machine track. The PCB
sliding on both tracks should be smooth without height drop.
Lock the fixing nuts of the four foot cups.
6.3 Starting the equipment
Connect the air pressure, connect the power supply according to the standard on the
equipment nameplate, and ensure the safe grounding of the equipment. Turn on the red universal
change-over switch on the right side of the equipment to start main power supply, check to
ensure the emergency stop button has not been pressed. Then, turn on the power of the host.
After the system normally enters the Windows interface, double click on the AOI software
shortcut on the desktop to open the software.
If there is an emergency during operation, press the emergency button immediately. After
eliminating the emergency and ensuring that the equipment and personnel are safe, rotate the
emergency button clockwise and release it to reset. Press the RUN button again to turn on the
main power of the equipment again.