CHAPTER 2 INSTALLATION
Floor Standing Installation
NEAX2000 IVS
2
Installation Procedure Manual
Page 70
ND-70928 (E), Issue 1.0
• Installation of TOP COVER
(1) Hang four hooks of the TOP COVER on the back board of PIM as shown below.
(2) Secure the TOP COVER to the front side of the PIM with two screws.
NOTE:
Screws are attached to BASE/TOP ASSEM.
HOOK