CHAPTER 2 INSTALLATION
Using Installation Cable
NEAX2000 IVS
2
Installation Procedure Manual
ND-70928 (E), Issue 1.0
Page 53
(4)
When the system is two-frame configuration, the Installation cable of the right side frame
can go through the BASE of the left side frame.
Figure 2-6 Installation Cable Wiring for Two-Frame Configuration
BASE
FG
LINE
NEUTRAL
FG
LINE
NEUTRAL
TERMINAL
BLOCKS
TO
AC POWER
DISTRIBUTION
BOARD
INSTALLATION CABLE
CORD BUSH