CHAPTER 2 INSTALLATION
Fixed Equipment (For Other Countries)
NEAX2000 IVS
2
Installation Procedure Manual
Page 48
ND-70928 (E), Issue 1.0
The mark shown below is attached to each procedure in which circuit cards are handled. When
doing such a procedure, the installer must perform the procedure with caution, to prevent dam-
age caused by static electricity (See “Static Electricity Guard” on
Page 39
).
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required