1. Installation of External MDF
•
Secure the external MDF onto the floor or mount the MDF onto the wall.
•
Mount the required MDF components.
•
If required, install the cable ducts for the cables to be laid between the MDF and the Main Equipment. In
this case, confirm the locations of the cable holes for the Main Equipment. Refer to
Figure 004-1
.
Figure 004-1 Location of the Cable Hole
NAP 200-004
Sheet 1/12
Installation of Peripheral Equipment
FRONT
430 mm (16.9 inch)
RACK PARTS
214 mm (8.4 inch)
184 mm (7.2 inch)
30 mm (1.2 inch)
CABLE HOLE