ND-45492 (E)
CHAPTER 3
Page 135
Revision 2.0
•
Install the PZ-8PFTA card to the PIM according to the following steps.
STEP 1:
Connect the champ connectors of 25-pair cables to the PFT0 and PFT1 connectors on the
PZ-8PFTA card as shown in
Figure 007-42
. Then, secure them to each other using screws
and tie wraps.
Figure 007-42 Connection of 25-Pair Cable and PZ-8PFTA
NAP 200-007
Sheet 50/56
Termination of Cables on the MDF
+
+
TO MDF
(SEE STEP 3)
25-PAIR CABLE
CHAMP CONNECTOR (PROVIDED WITH PZ-8PFTA)
PFT0 CONNECTOR
PFT1 CONNECTOR
PZ-8PFTA
+
+