CHAPTER 3
ND-45492 (E)
Page 48
Revision 2.0
(2) When mounting the RACK PARTS to a wall, connect all the RACK PARTS to each other, and connect the
BASE to the bottom RACK PARTS using the M5 Machine screws (provided), as shown in
Figure 003-21
.
Figure 003-22 Connecting the RACK PARTS and the BASE
NAP 200-003
Sheet 26/37
Installation of Main Equipment
(JOINT)
RACK PARTS
M5 MACHINE SCREW-C
(x2/JOINT AREA)
(PROVIDED WITH RACK PARTS)
(JOINT)
BASE