ND-45492 (E)
CHAPTER 3
Page 37
Revision 2.0
(c) When the system is a two-frame configuration, the 3P AC Power Cable of the left side frame can go
through the BASE of the right side frame, as shown in
Figure 003-12
.
Figure 003-13 AC Power Cable Wiring for Two-Frame Configuration
NAP 200-003
Sheet 15/37
Installation of Main Equipment
FG
NEUTRAL
LINE
FG
NEUTRAL
LINE
3P AC POWER CABLE
TO 120/240 V AC
SOURCE POWER
SUPPLEMENTARY GROUND
(TO COLD WATER PIPE, ETC.)