CHAPTER 3
ND-45492 (E)
Page 16
Revision 2.0
2. PROCEDURE
This section explains the procedures for installing the NEAX2000 IVS system. The installer should follow the
procedure shown in the following flowchart. In the flowchart, a NAP number is denoted to the right side of each
step. The NAP Number refers to the details for each procedure.
Figure 3-2 Procedure Flowchart (1 of 2)
START
UNPACKING
MARKING AND DRILLING
INSTALLATION
OF
MAIN EQUIPMENT
CONNECTION
OF
BATTERY
TERMINATION OF
CABLES ON THE MDF
INSTALLATION
OF
PERIPHERAL EQUIPMENT
CABLE RUNNING
SWITCH SETTING
OF
CIRCUIT CARDS
A
NAP- 200-001
NAP- 200-002
NAP- 200-003
NAP- 200-004
NAP- 200-005
NAP- 200-006
NAP- 200-007
REFER TO CIRCUIT CARD MANUAL
TO THE MDF