3-12 Setting Up Your Server
2.
At least two persons are required to install the server. Securely hold the server and install
it in the rack.
Firmly fit the inner rails on the sides of the server into the rail assemblies that are installed
on the rack, and then slowly push the server into the rack.
If the server is locked on its way into the rack, slowly push it in while pressing the release
levers (blue) on the right and left sides of the server.
When the server is completely pushed into the rack, the server is locked.
Rail assembly
Inner rail at server side
Release lever (blue)
Summary of Contents for N8100-1429F
Page 16: ...x This page is intentionally left blank...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank...
Page 172: ...5 36 Installing the Operating System with Express Setup This page is intentionally left blank...
Page 194: ...6 22 Installing and Using Utilities This page is intentionally left blank...
Page 206: ...7 12 Maintenance This page is intentionally left blank...
Page 284: ...9 36 Upgrading Your Server This page is intentionally left blank...
Page 286: ...A 2 Specifications This page is intentionally left blank...
Page 294: ...C 2 IRQ This page is intentionally left blank...
Page 348: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank...
Page 352: ...G 4 Product Configuration Record Table This page is intentionally left blank...