![NEC N8100-1429F User Manual Download Page 171](http://html1.mh-extra.com/html/nec/n8100-1429f/n8100-1429f_user-manual_4242032171.webp)
Installing the Operating System with Express Setup 5-35
Installing with the OEM-FD for Mass Storage Device
This section explains how to setup with the OEM-FD. You usually do not have to do as follows. If
your system has any Mass storage devices, you have to set as follows depending on your system.
The detailed information is provided by the manual of the Mass storage device.
Installation of Mass storage device not to be supported by Express Setup
If you would like to install or re-install the OS when the system has new mass storage device not to
be supported by NEC EXPRESSBUILDER, you have to set as follows.
1.
Read the manual supplied with the mass storage device before setting the server.
2.
If the mass storage device is RAID Controller, configure the RAID System before running
the NEC EXPRESSBUILDER.
3.
Boot the system from NEC EXPRESSBUILDER DVD.
4.
Select [Load the optional driver into the EXPRESSBUILDER] from the Top menu, click
[Next].
Setting the driver disk for the mass storage controller.
Press the "Perform" button.
NOTE:
By choosing this option, you can load the driver provided by
CD-ROM or floppy disk to proceed with the Express Setup.
5.
Perform Express Setup with the following settings.
(a) When "Enter RAID settings" appears, check "Skip the logical drive creation".
(b) Select "Apply OEM-Disk for Mass storage device".
6.
Copy the driver for the mass storage device in the Express Setup.
Insert the floppy disk attached the mass storage device into the floppy disk drive.
Continue the Express Setup, referring to messages displayed on the display.
Summary of Contents for N8100-1429F
Page 16: ...x This page is intentionally left blank...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank...
Page 172: ...5 36 Installing the Operating System with Express Setup This page is intentionally left blank...
Page 194: ...6 22 Installing and Using Utilities This page is intentionally left blank...
Page 206: ...7 12 Maintenance This page is intentionally left blank...
Page 284: ...9 36 Upgrading Your Server This page is intentionally left blank...
Page 286: ...A 2 Specifications This page is intentionally left blank...
Page 294: ...C 2 IRQ This page is intentionally left blank...
Page 348: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank...
Page 352: ...G 4 Product Configuration Record Table This page is intentionally left blank...