Setting Up Your Server 3-21
After a few seconds your system begins the internal Power-On Self Test (POST). POST
automatically checks the system board, CPU module, memory, keyboard, and most
installed peripheral devices.
IMPORTANT:
Always allow POST to complete before powering down your
system.
The server management logic on your system board monitors and
logs system voltage changes. When powering down your system
you may experience a 30-second delay from the time you press the
push-button power on/off switch on the front panel and your system
powering down. This is normal system operation and is required by
the server management logic.
If you have problems powering on your system, see Chapter 8.
After you have successfully powered on your system, insert the NEC EXPRESSBUILDER
CD-ROM into the DVD-ROM drive, reboot the system and follow the screen prompts to run NEC
EXPRESSBUILDER.
Summary of Contents for Express5800/120Ri-2
Page 16: ...x This page is intentionally left blank ...
Page 19: ...Notes on Using Your Server 1 3 Internal View ...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Page 68: ...2 34 General Description This page is intentionally left blank ...
Page 157: ...Installing the Operating System with Express Setup 5 29 This page is intentionally left blank ...
Page 193: ...7 12 Maintenance This page is intentionally left blank ...
Page 303: ...C 2 IRQ This page is intentionally left blank ...
Page 323: ...D 20 Installing Windows Server 2003 x64 Editions This page is intentionally left blank ...
Page 349: ...F 4 Product Configuration Record Table This page is intentionally left blank ...