9-48 Upgrading Your Server
Removal
Follow these steps to remove or replace the hot-swap fan.
1.
Pull out the server from the rack.
2.
Open the drive cover.
3.
Locate the failed fan.
Fault lamp on the fan turns on when a fan failure occurs. A fan failure is also indicated by
NEC ESMPRO and system event log.
4.
While pressing release tabs on the top of the fan, pull the fan up to remove from the fan
slot.
5.
Install the new fan into the vacant slot.
IMPORTANT:
If all the redundant fans are removed. Change the
jumper (J11) setting described earlier in the installation procedure.
If the remote management card (option) is installed in your server, follow these steps to
configure the firmware program.
Summary of Contents for Express5800/120Re
Page 12: ...iv This page is intentionally left blank ...
Page 34: ...1 16 Notes on Using Your Server This page is intentionally left blank ...
Page 136: ...4 38 Configuring Your Server This page is intentionally left blank ...
Page 182: ...5 46 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 206: ...6 24 Installing and Using Utilities This page is intentionally left blank ...
Page 218: ...7 12 Maintenance This page is intentionally left blank ...
Page 316: ...C 2 IRQ This page is intentionally left blank ...
Page 346: ...F 4 Product Configuration Record Table This page is intentionally left blank ...