9-4 Upgrading Your Server
PREPARING YOUR SYSTEM FOR UPGRADE
Follow the procedure below to prepare for installing or removing components.
1.
Prepare the Phillips screwdriver.
2.
Shut down the OS.
3.
Unlock the front bezel.
4.
Remove the front bezel.
5.
Press the POWER switch to power off the server (the POWER lamp goes off).
6.
Remove all cables and power cords from the server.
Unlocked
Locked
Summary of Contents for Express5800/120Re
Page 12: ...iv This page is intentionally left blank ...
Page 34: ...1 16 Notes on Using Your Server This page is intentionally left blank ...
Page 136: ...4 38 Configuring Your Server This page is intentionally left blank ...
Page 182: ...5 46 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 206: ...6 24 Installing and Using Utilities This page is intentionally left blank ...
Page 218: ...7 12 Maintenance This page is intentionally left blank ...
Page 316: ...C 2 IRQ This page is intentionally left blank ...
Page 346: ...F 4 Product Configuration Record Table This page is intentionally left blank ...