4-16
Upgrading Your System
3.
Remove and save the expansion slot cover by sliding it straight back and out
of the slot.
Removing the Expansion Slot Cover
!
CAUTION
Observe static precautions. Use an antistatic wrist strap.
4.
Remove the option board from its protective wrapper, holding the board
only by the edges. Do not touch the board components or the gold
connectors.
5.
Record the option board serial number in the equipment log.
6.
Set any board jumpers or switches as described in the documentation that
comes with the option board.
7.
Refer to the documentation accompanying the option board for information
on whether the board is a PCI or ISA board. Refer to “Option Board
Hardware Configurations” table to determine the recommended option board
slot assignment and configuration parameters.
Summary of Contents for Express5800/120Mc2 series
Page 1: ... U s e r s G u i d e EXPRESS5800 120Mc2 ...
Page 2: ...xxx ...
Page 3: ... U s e r s G u i d e EXPRESS5800 120Mc2 ...
Page 50: ...2 18 Setting Up the System ...
Page 106: ...4 34 Upgrading Your System Plugging in the AC Power Cords ...
Page 154: ...B 22 Management Workstation Application ...
Page 155: ...C System Status Hardware Support Information ...
Page 166: ...10 Glossary ...
Page 171: ...xx ...
Page 172: ... 456 01524 000 ...