background image

Micro Data Center Level E

7999.009 

Operating instructions

Summary of Contents for 7999.009

Page 1: ...Micro Data Center Level E 7999 009 Operating instructions ...

Page 2: ... Center Level E We wish you every success Your Rittal GmbH Co KG Rittal GmbH Co KG Auf dem Stützelberg 35745 Herborn Germany Tel 49 0 2772 505 0 Fax 49 0 2772 505 2319 E mail info rittal de www rittal com www rittal de We are always happy to answer any technical questions regarding our entire range of products ...

Page 3: ...9 3 5 Dimensions and clearances 10 3 6 Scope of supply 10 4 Assembly and siting 11 4 1 Installation site requirements 11 4 1 1 Average surface load of the Micro Data Center Level E 13 5 Transport 15 6 Installation and commissioning 16 7 Operation 17 7 1 Handling the doors 17 7 1 1 Mechanical key lock 17 7 1 2 Code Combi B electronic key combination lock 18 7 1 3 Electronic lock for activation by a...

Page 4: ...e operating instructions The following symbols are used in this documentation This symbol indicates an Action Point and shows that you should perform an operation procedure 1 4 Other applicable documents Manufacturer s statement Operating instructions of all components sold and in stalled by Rittal Danger This warning symbol is used to indicate great dangers caused by the product which may result ...

Page 5: ... and connected with the central earthing point in the Micro Data Center Also ensure the reliable protective earth ing of all built in components Ensure the adequately dimensioned cur rent carrying capacity of the potential equalisation The customer must earth the built in components Explosion hazard If UPSs with integrated or separate bat tery packs are installed in the Micro Data Center this can ...

Page 6: ... on a flat floor with max 2 deviation to guarantee the correct function of the safe ty doors Note Do not change the location of the Micro Data Center yourself and do not disassemble it yourself Contact the manufacturer or a service com pany authorised by the manufacturer to per form this work Note Prior to the assembly of the Micro Data Center check the requirements placed on the operational envir...

Page 7: ...d Otherwise the Micro Data Center will be damaged Note Never drill any holes in the side panels top or floor elements or the safety doors without consulting the manufacturer This can cause damage to the insulation materials of the Mi cro Data Center walls Any warranty claim is void in this case Note After the commissioning of the Micro Data Center do not have any keys duplicated by a key service I...

Page 8: ...nsion of the system or its installation at a dif ferent location High temperature expansion and water resistant seals are provided between the joints of the cell elements The elements consist of a multi layer insulant structure mounted in a sheet steel cassette In its standard variant the modular safety cell consists of a top and a floor element two side elements operator and service door as well ...

Page 9: ...the passage of larger connector plugs the centre bar can be removed but must be replaced before being sealed The cable box can be occupied 100 The cable box may be occupied with cables with maxi mum 15 mm diameter The cable box may be occupied with 3311 040 water supply and return hoses for the LCP No steel tubes may be fed through the cable box Hard duct To guarantee large manipulation assurance ...

Page 10: ...ccessories not approved by Rittal GmbH Co KG 3 5 Dimensions and clearances Information about the dimensions can be found on the dimensioned drawings in the Appendix Clearances to be observed for the erection of the Micro Data Center are listed in section 4 1 Installation site requirements 3 6 Scope of supply Micro Data Center Level E Accessories provided in accordance with the order confirmation O...

Page 11: ... Hz N PE line side time delay fuse 20 A 2 x Power for the LCU DX must be supplied at the ex ternal unit 8 Cut outs The customer is responsible for creating and closing of the drilled tapped holes and cut outs as well as the opening and closing of the existing intermediate floors and floors 9 The customer must ensure that the protective con ductor is fed from outside and connected correctly with th...

Page 12: ... salesrooms in retail outlets and department stores with salesrooms 50 m and high storage shelves with ade quate lateral distribution in accordance with 2 and per mitted uniformly distributed characteristic live loads of q k 5 0 kN m Category E1 1 line 16 light duty areas in factories and workshops as well as ar eas in large animal barns with adequate lateral distribu tion in accordance with 2 and...

Page 13: ...Components Weight kg Average surface load assuming a total weight of 1230 kg based on one Micro Data Center Micro Data Center Level E 700 Line a 433 kg m on a bare floor TS IT rack 80 Climate control unit LCP is not considered 150 Live load 300 Line b 929 kg m directly below the Micro Data Center sur face for floating floors or surface coverings etc Total weight 1230 Rittal Micro Data Center Level...

Page 14: ...a Center Level E 47 U 1200 mm interior depth with two double leaf doors Components Weight kg Average surface load assuming a total weight of 1340 kg based on one Micro Data Center Micro Data Center Level E 800 Line a 566 kg m on a bare floor TS IT rack 90 Climate control unit LCP is not considered 150 Live load 300 Line b 868 kg m directly below the Micro Data Center sur face for floating floors o...

Page 15: ...Rittal Micro Data Center Level E 15 5 Transport EN 5 Transport Note The Micro Data Center may be transported only by trained specialists certified by Rittal GmbH Co KG ...

Page 16: ...tion must be checked for the installation of units without official approval The installation of the units must conform with the associated provisions for the installation of electrical units and data processing units The installation may be performed only by trained specialists with the appropriate ap proval Prior to equipping the Micro Data Center you should specify the placement of all compo ne...

Page 17: ...quipped Micro Data Center can lead to injuries Before closing the not fully equipped Micro Data Center ensure that no per sons are still present inside it Caution There is the danger of tipping when the doors are opened 180 and the housing is empty Ensure that the Micro Data Center does not tip If necessary secure it to a solid surface Note The safety doors of the Micro Data Center can be opened o...

Page 18: ...ou have maximum 20 seconds for each individual key input If you do not operate any key within these 20 sec onds the electronics switch off automatically Any in complete operator actions must then be restarted Code inputs can be cancelled by pressing the P key The factory code setting for the lock is 123456 For safe ty reasons change this factory code setting immediately to your own personal code D...

Page 19: ...ered The green LED illuminates continually The lock is ready to be programmed Three times The red LED flashes three times An invalid code was entered or The input was cancelled with P Ten times The red LED flashes ten times after the ON key was pressed Undervoltage 1 2 4 8 or 16 min utes The red LED flashes in second intervals for 1 2 4 8 or 16 minutes after the ON key was pressed The lock is in p...

Page 20: ...once Test the newly programmed primary code by closing and reopening the lock If the new primary code was not confirmed correctly with the repeated input the following signal message ap pears three times Repeat the action Activating changing the secondary code by the primary code holder Open the lock with the valid 6 digit primary code see page 20 Press the ON key Press the P key Enter the valid 6...

Page 21: ... first subcode The signal message appears once Enter the valid 6 digit second subcode The signal message appears once Turn the bar handle within 4 seconds clockwise until it reaches the limit If the lock was last opened with a primary code the fol lowing signal message occurs three times The sequence of the subcode must be observed To open the lock the primary subcode and then the secondary subcod...

Page 22: ...e lock can be opened only with first and second subcode four eyes principle Open the lock with the valid 6 digit secondary code see page 20 Press the ON key Press the P key Enter the valid dual code The signal message appears Press the P key Press the 7 key Enter the new 6 digit first subcode The signal message appears twice Re enter the new valid 6 digit first subcode The signal message appears o...

Page 23: ...mit Time delay TD and opening window OW func tions Time delay TD is designated as the period of time which must elapse before the lock can be opened The opening window OW is designated as the time period during which the lock can be opened after the TD has elapsed Each valid code can be given a TD and an OW Activating changing the TD OW Open the lock with the valid code Press the ON key Press the ...

Page 24: ...tery is not accessible externally the lock must be opened using the inspection key for a discharged or defective battery see page 24 Battery replacement for a separate battery com partment Move the drawer of the battery compartment as shown by the indicated arrow direction fluting on the drawer and remove the complete unit Remove the empty battery and place the new battery in the drawer Reinsert t...

Page 25: ...g points The signal message appears Clear the alarm This can be performed only by the primary code hold er in parallel mode or by the dual code holder in ordi nary dual code mode Procedure Press the ON key Press the P key Enter the valid 6 digit primary code The signal message appears Press the P key The signal message appears Press the 9 key The signal message appears once Inspection opening quic...

Page 26: ...ger voltage 1 negative trigger voltage 3 4 475 ohm Umin 5 V DC 12 V 100 ED 18 V 100 ED Umax 24 V 40 ED In out Revision bolt switch contact key position 1 normally closed 2 normally open 3 common Change over contact 50 mA 30 V DC Bolt switch contact key position 4 normally closed 5 normally open 6 common Change over contact 50 mA 30 V DC Release magnet 7 positive trigger voltage 8 negative trigger ...

Page 27: ...in spection of all mechanical components roughly every 12 months If damage has occurred e g a worn lip seal at the doors you should inform the manufacturer service department without delay RITTAL GmbH Co KG Auf dem Stützelberg D 35745 Herborn Germany 8 3 Maintenance contract We recommend that you have a maintenance contract for an annual inspection These safety inspections guar antee the full oper...

Page 28: ...m mends that it is disconnected from the mains power supply and protected from dampness and dust 9 2 Disposal The materials of the Micro Data Center should be han dled as household refuse They are not hazardous waste This however applies only to the Micro Data Center not for built in components such as the cooling unit the fire extinguishing system etc ...

Page 29: ...1100 1100 1100 Height H1 2210 2410 2210 2410 Depth T1 1200 1200 1400 1400 Internal dimensions mm Width B2 920 920 920 920 Height H2 2030 2230 2030 2230 Depth T2 1000 1000 1200 1200 Model No the Micro Data Center is configured on a project specific basis 7999 009 7999 009 7999 009 7999 009 7999 009 Empty weight excluding cooling unit and excluding rack approx kg 660 700 730 800 ...

Page 30: ... Processing Unit 7030 000 Further vari ants refer to the cat alogue Component Model No Remarks DET AC III 7338 121 Further vari ants refer to the cat alogue DET AC III Slave 7338 321 Further vari ants refer to the cat alogue EFD III 7338 221 Further vari ants refer to the cat alogue Component Model No Remarks PSM Plus busbars 7856 015 Further vari ants refer to the cat alogue PDU Power Distributio...

Page 31: ... 1 Satz 1 set 1 jeu X mm F N VE St Packs of UE p Best Nr Model No Référence DK B 400 600 500 11 5501 675 600 900 500 11 5501 685 400 600 1000 11 5501 715 600 900 1000 11 5501 725 1 1 Satz 1 set 1 jeu Catalogue X mm F N VE St Packs of UE p Best Nr Model No Référence TS DK E 400 600 800 2 5501 460 600 900 1500 2 5501 480 X mm D mm F N VE St Packs of UE p Best Nr Model No Référence TS C 150 300 2 550...

Page 32: ...Rittal Micro Data Center Level E Catalogue VE St Packs of UE p Best Nr Model No Référence DK 14 5502 115 F R F R H mm HE U U VE St Packs of UE p Best Nr Model No Référence DK 2000 42 1 5502 105 2200 47 1 5502 145 Catalogue ...

Page 33: ...EN H mm VE St Packs of UE p Best Nr Model No Référence DK 2000 2200 1 5502 120 Catalogue Catalogue VE St Packs of UE p Best Nr Model No Référence DK 10 5502 155 Catalogue VE St Packs of UE p Best Nr Model No Référence DK 11 7856 029 1 1 Satz 1 set 1 jeu ...

Page 34: ...harge of the condensate must be pro vided by the customer at the installation site Function principle of the split units The evaporator in the interior of the Micro Data Center consists essentially of a heat exchanger and a fan group that circulates the air within the Micro Data Center i e the cooled air is blown out in front of the 482 6 mm 19 level the hot air is extracted at the back of the ser...

Page 35: ... proper intrusions in the design and function as well as cases of water ingress and fires within and in the immediate vicinity of the Mi cro Data Center the validity of the recogni tion of the test ratings is voided In such cases please contact the manufacturer with out delay otherwise the warranty is voided ...

Page 36: ...ta Center Level E 14 Customer service addresses For technical questions please contact Tel 49 0 2772 505 9052 E mail info rittal de Homepage www rittal com For complaints or service requests please contact Tel 49 0 2772 505 1855 E mail service rittal de ...

Page 37: ...Rittal Micro Data Center Level E 37 Notes ...

Page 38: ...Notes 38 Rittal Micro Data Center Level E ...

Page 39: ...Rittal Micro Data Center Level E 39 Notes ...

Page 40: ... Services You can find the contact details of all Rittal companies throughout the world here www rittal com contact RITTAL GmbH Co KG Postfach 1662 35726 Herborn Germany Phone 49 2772 505 0 Fax 49 2772 505 2319 E mail info rittal de www rittal com 04 2019 D 0000 00002164 00 ...

Reviews: