Setting Up the System 2-7
4.
Lift the rack-mount server unit (C) onto the two support brackets and slide it
toward the rear of the rack cabinet.
!
WARNING
It is strongly recommended that two people are present
when lifting and assembling the rack-mount server unit into a
rack cabinet.
5.
Secure the front bezel to the rack cabinet's front vertical mounting rails (B)
using the four screws (E) and plastic washers (D) provided with the rack
cabinet.
A
– Rear vertical mounting rail
D –
Four plastic washers
B
– Front vertical mounting rail
E –
Four screws
C
– Rack-mount server unit
Installing the Rack-Mount Server Unit into the Rack Cabinet
Summary of Contents for Express5800/120Mc2 series
Page 1: ... U s e r s G u i d e EXPRESS5800 120Mc2 ...
Page 2: ...xxx ...
Page 3: ... U s e r s G u i d e EXPRESS5800 120Mc2 ...
Page 50: ...2 18 Setting Up the System ...
Page 106: ...4 34 Upgrading Your System Plugging in the AC Power Cords ...
Page 154: ...B 22 Management Workstation Application ...
Page 155: ...C System Status Hardware Support Information ...
Page 166: ...10 Glossary ...
Page 171: ...xx ...
Page 172: ... 456 01524 000 ...