![Nautel VS300 Operation And Maintenance Manual Download Page 215](http://html2.mh-extra.com/html/nautel/vs300/vs300_operation-and-maintenance-manual_3601831215.webp)
VS300 Operations and Maintenance Manual
Routine maintenance
Page 3-2
Issue 8.0 2016-03-01
Checking hardware
All hardware must be checked at least once a year. Nautel recommends more frequent checking if the
VS300 is subjected to above average thermal cycling, caused by turning the VS300 on and off.
•
To prevent damaging the hardware, ensure that the proper size tools are used. In most cases,
hardware is metric.
•
A mounting surface or terminal that has changed colour indicates a loose hardware connec-
tion.
Battery replacement
The VS300's exciter/control PWB contains a battery backup circuit that allows the time and date to
update during ac power failure. The battery should be replaced every 12 months. See
exciter/control PWB battery” on page 3-4
.
Summary of Contents for VS300
Page 2: ......
Page 4: ......
Page 8: ...VS300 Operations and Maintenance Manual Page viii Issue 8 0 2016 03 01...
Page 14: ...VS300 Operations and Maintenance Manual Description Page 1 6 Issue 8 0 2016 03 01...
Page 228: ......