ZephIR user manual QP1009-582 v2
© Natural Power 2008
10
th
June 2008
Page 19
System Interconnections
Configuration of the System Interconnections and the
Louvre installation should not be undertaken until the met
mast, met station, optics pod, electronics pod, battery pod
and tripod configuration has been completed.
System Interconnections Overview
The Electronics Pod is the central hub for all system
interconnections; power supplies are fed from the battery
pod to the electronics pod and re-distributed from this
point. All other system and data interconnections are also
managed through this hub.
The following sections detail the specific cable
interconnections to the electronics pod and the relevant
interconnecting system components.