Table of Contents
Table of Contents
Table of Contents
Table of Contents
IMPORTANT
IMPORTANT
For EZ-CFDL series
For EZ-CFDL series
In case of the
In case of the EZ-CFDL ser
EZ-CFDL series, please read the chapter 8
ies, please read the chapter 8 first.
first.
Some setup procedures are not the same with other robot
Some setup procedures are not the same with other robot series.
series.
Chapter 1
Chapter 1
Point on Safety
Point on Safety
1.1
1.1
For safely use the robo
For safely use the robot system
t system ..........................................................................................
.......................................................................................................
............. 1-1
1-1
1.1.1
1.1.1
Symbols used in all instruction manuals....................................................................................1-1
Symbols used in all instruction manuals....................................................................................1-1
1.1.2
1.1.2
General precau
General precautions for safely use the robot system
tions for safely use the robot system ................................................................1-2
................................................................1-2
1.1.3
1.1.3
Safety Measures on manipulator...............................................................................................1-4
Safety Measures on manipulator...............................................................................................1-4
1.1.4
1.1.4
Safety measures in teaching and inspectio
Safety measures in teaching and inspection
n...........................................................................
.............................................................................
.. 1-5
1-5
1.1.5
1.1.5
Safety measures in test run.......................................................................................................1-8
Safety measures in test run.......................................................................................................1-8
1.1.6
1.1.6
Safety measures in auto operatio
Safety measures in auto operation
n..........................................................................
............................................................................................
.................. 1-8
1-8
1.1.7
1.1.7
Brake Positive Release.........................................................................................................
Brake Positive Release............................................................................................................
... 1-10
1-10
1.1.8
1.1.8
Movement, alienatio
Movement, alienation and selling of
n and selling of robot system ..................................................................1-10
robot system ..................................................................1-10
1.1.9
1.1.9
Stora
Storage of
ge of robot system...........................................................................................................1-10
robot system...........................................................................................................1-10
1.1.10
1.1.10 Disposition of
Disposition of Robot system
Robot system ...................................................................................
....................................................................................................
................. 1-10
1-10
1.1.11
1.1.11 Labels and marks on
Labels and marks on manipulato
manipulator and controller ....................................................................1-12
r and controller ....................................................................1-12
1.2
1.2
Precautions for undertakin
Precautions for undertaking work inside the
g work inside the manipulato
manipulator’s work
r’s work area ..........................................1-14
area ..........................................1-14
Chapter 2
Chapter 2
Transportation and Installation
Transportation and Installation
2.1
2.1
From the installation work to the teaching work...............................................................................2-1
From the installation work to the teaching work...............................................................................2-1
2.2
2.2
Installation of this controller.........................................................................................
Installation of this controller..............................................................................................................
..................... 2-2
2-2
2.2.1
2.2.1
Environment...............................................................................................................................2-2
Environment...............................................................................................................................2-2
2.2.2
2.2.2
Install dimension
Install dimensions of robot controlle
s of robot controllerr .........................................................................................2-2
.........................................................................................2-2
2.3
2.3
Robot installation.............................................................................................................
Robot installation..............................................................................................................................
................. 2-3
2-3
2.4
2.4
Robot connection ...............................................................................................................
Robot connection .............................................................................................................................
.............. 2-4
2-4
2.4.1
2.4.1
Connection of CNR01 and CNR04............................................................................................2-4
Connection of CNR01 and CNR04............................................................................................2-4
2.4.2
2.4.2
Connection of CNR10
Connection of CNR10 (option) .....................................
(option) ..................................................................................................2-5
.............................................................2-5
2.5
2.5
T
Teach pendant (TP) connection
each pendant (TP) connection ........................................................................................
.......................................................................................................
............... 2-6
2-6
2.6
2.6
External equipment connection..................................................................................................
External equipment connection........................................................................................................
...... 2-7
2-7
2.6.1
2.6.1
Cable conn
Cable connection
ection ..................................................................................
.......................................................................................................................2-7
.....................................2-7
2.6.2
2.6.2
T
To start the program using the external PLC etc.
o start the program using the external PLC etc. ......................................................................2-7
......................................................................2-7
2.7
2.7
Primary power and the
Primary power and the grounding connectio
grounding connection .................................................................................2-8
n .................................................................................2-8
2.7.1
2.7.1
Prior to Primary powe
Prior to Primary power supply connection
r supply connections
s ...............................................................................2-8
...............................................................................2-8
2.7.2
2.7.2
Assembling the
Assembling the Primary power
Primary power supply cable..........................................................
supply cable.............................................................................
................... 2-9
2-9
2.7.3
2.7.3
Connecting the Prim
Connecting the Primary power supply cabl
ary power supply cable
e ...........................................................................2-10
...........................................................................2-10
2.7.4
2.7.4
Grounding
Grounding .................................................................................
................................................................................................................................2-10
...............................................2-10
2.8
2.8
Safety-related si
Safety-related signal connection
gnal connections
s ..................................................................................
..................................................................................................
................ 2-1
2-11
1
2.8.1
2.8.1
Sequence board .................................................................................................................
Sequence board ......................................................................................................................
..... 2-1
2-11
1
2.8.2
2.8.2
T
Terminal block TBEX1 and TBEX2
erminal block TBEX1 and TBEX2 ...............................................................................
..........................................................................................
........... 2-12
2-12
2.8.3
2.8.3
Pin layout of the terminal block TBEX1 and TBE
Pin layout of the terminal block TBEX1 and TBEX2
X2................................................................2-13
................................................................2-13
2.8.4
2.8.4
Electrical specification o
Electrical specification of input terminal block
f input terminal block .........................................................................2-16
.........................................................................2-16
Summary of Contents for EZ-CFDL Series
Page 2: ......
Page 8: ...Table of Contents NOTE ...
Page 10: ...ぺージあわせのため白文字 白文字のため印刷されないなので気にしないでください 削除しないでください ...
Page 58: ...4 4Interference Territory registration NOTE ...
Page 59: ......
Page 68: ...5 4File transfer FTP server NOTE ...
Page 70: ......
Page 83: ......