USER MANUAL SWG
Page 70 of 129
Depending on the analyser type, the first or the first and second phase cannot be deleted,
deactivated or moved to another position.
Delete a phase
With
F1
a phase can be deleted. To do this, select the phase, which should be deleted and press
F1
.
6.4.
Insert a phase
With
F3
a new phase is inserted in the measurement cycle. With the
right/left arrow keys
the
different phase types can be selected.
In the title-
With
OK
shown and changed.
6.5.
Configuration of the phase details
In this chapter the different cycle phase details will be explained.
Zeroing (Cycle phase details):
Z
EROING
configured.
ZEROING
Measuring site valves
Valves closed
Zeroing valve
Valve open
Duration
2min to 1 h
Recommendation
5min., in general not to be changed by user as depending
only on analyzer internal setup
+
=
Screenshot shows how a
phase can be deleted. In
this example the last
The two auto-configurations, which can be selected.
Summary of Contents for SWG 100 SYNGAS
Page 1: ...SWG 100 SYNGAS USER MANUAL ...
Page 12: ...USER MANUAL SWG Page 12 of 129 11 H3PO4 inlet G1 8 inner thread ...
Page 24: ...USER MANUAL SWG Page 24 of 129 ...
Page 32: ...USER MANUAL SWG ...
Page 63: ...USER MANUAL SWG Page 63 of 129 Detail A Alarm Relais ...
Page 89: ...USER MANUAL SWG Page 89 of 129 8 3 Description of the analyser 1 1 1 1 2 ...
Page 99: ...USER MANUAL SWG Page 99 of 129 ...
Page 110: ...USER MANUAL SWG Page 110 of 129 12 Appendix ...
Page 114: ...USER MANUAL SWG Page 114 of 129 ...
Page 116: ...USER MANUAL SWG Page 116 of 129 Positions of the components 3 4 ...
Page 127: ...USER MANUAL SWG Page 127 of 129 ...
Page 129: ...USER MANUAL SWG Page 129 of 129 ...