6 - 23 6 - 23
6 SETTING AND WIRING
(Procedure 3) Checking results of ROM/RAM/switch test
(1) When the result of the test is normal
The CH1 NEU LED turns on and the ERR LED turns off.
(2) When the result of the test is abnormal
The CH1 NEU LED turns on and the ERR LED turns on.
(Procedure 4) Ending a ROM/RAM/switch test
(1) When the result of the test is normal
(a) Perform an Self-loopback test.
Perform the test operation according to Section 6.4.2.
(b) Start the data communication with external devices.
1) Set the switch settings on GX Works2 according to in Section 7.3.
2) Turn off the power to the station on which the C24 is installed and connect
the communication cable with an external device.
3) Turn on the power to the station on which the C24 is installed.
(2) When the result of the test was abnormal
Check the contents of the error in the following items in the "Intelligent Function
Module Monitor" screen of GX Works2.
Summary of Contents for MELSEC LJ71C24
Page 1: ......
Page 2: ......
Page 18: ...A 16 A 16 INDEX REVISIONS WARRANTY...
Page 22: ...A 20 A 20 2 LJ71C24 R2 LJ71C24 R2 Before Using the Product...
Page 23: ...A 21 A 21 MEMO...
Page 38: ...4 2 4 2 4 PROCEDURES PRIOR TO OPERATION MEMO 4...
Page 105: ...7 30 7 30 7 SETTINGS FOR THE C24 MEMO...
Page 425: ......
Page 426: ......
Page 427: ......