5
PROCEDURES AND SETTINGS BEFORE OPERATION
1
OVE
R
VI
EW
2
SYS
TEM
CONFIGURA
T
ION
3
SP
ECIFI
C
A
T
IO
N
S
4
FUNCT
IONS
5
P
R
OCEDURES AND
S
E
TTINGS
BE
F
O
RE
O
PERA
T
IO
N
6
P
A
RAMETER
SETTI
NGS
7
IN
ST
A
LLI
NG
AN
D
UN
IN
S
TAL
LI
N
G
S
O
F
T
W
AR
E P
A
CK
AG
E
S
8
CC
IE Control
UT
IL
ITY
5.5 Test
5.5.1 Bus I/F test
5
- 18
5.5.1
Bus I/F test
This test checks the hardware of the Bus I/F function of the CC-Link IE Controller Network
board.
(1) In the "Parameter setting" screen of the CC IE Control utility, set Mode to
"Bus I/F test" and click the
button.
(2) The following confirmation dialog box appears.
Clicking the
button executes the bus I/F test.
(3) The result is displayed on Test result field of the "Board detail
information" screen.
If the test completes abnormally, consult your local Mitsubishi representative.
<Normal completion>
<Abnormal completion>
END
Setting
Yes