23
Wiring for Schedule Control
*To comply with the UL standards, fuses must be used.
For the fuses, use P405H produced by Daito Communication Apparatus or its equivalent.
*For the wiring length between each output terminal and the equipment, refer to
Contact output 1
Contact output 2
Contact output 3
RS-485
(
MODBUS RTU
)
Equipment A
Equipment B
Equipment C
(+)
(-)
(-)
(+)
(-)
(-)
(+)
(-)
(-)
EMU4-CNT-MB
Fuse 0.5 A