MS-890 Industrial Automation Scanner User Manual
14-3
Wiring Box
Installation Steps
1. Connect power through the portal holes (see
Check Required Hardware
on page 1-2).
2. Temporarily apply power to the scanner and confirm that the light next to the input
terminal is green and not red.
3. Disconnect power before making the remaining connections.
4. Connect the host and trigger port wires through the portal holes to the appropriate
connections.
5. Plug the ribbon cable into the scanner as shown below (apply pressure back and forth
on the connector to ensure that it fits inside the receptacle).
Base mounting plate of
wiring box
Portal holes
3/4” pipe thread
(4 places)
Bottom plate of
scanner attaches to
top of wiring box
Wiring box
Ribbon Cable
Summary of Contents for MS-890
Page 1: ...MS 890 Industrial Automation Scanner User Manual P N 84 000890 Rev B...
Page 12: ...xii MS 890 Industrial Automation Scanner User Manual Statement of RoHS Compliance...
Page 26: ...1 14 MS 890 Industrial Automation Scanner User Manual Save Configuration in ESP...
Page 44: ...2 18 MS 890 Industrial Automation Scanner User Manual Send Receive Options...
Page 94: ...4 24 MS 890 Industrial Automation Scanner User Manual Tracking Adjustment...
Page 122: ...5 28 MS 890 Industrial Automation Scanner User Manual Autodiscriminate...
Page 154: ...6 32 MS 890 Industrial Automation Scanner User Manual Quality Output...
Page 168: ...7 14 MS 890 Industrial Automation Scanner User Manual Mismatch Replace...
Page 202: ...9 22 MS 890 Industrial Automation Scanner User Manual Calibration by Embedded Menu...
Page 212: ...10 10 MS 890 Industrial Automation Scanner User Manual Raster Laser by Embedded Menu...
Page 240: ...12 22 MS 890 Industrial Automation Scanner User Manual Scanner Status Requests...
Page 264: ...14 10 MS 890 Industrial Automation Scanner User Manual Mounting Plate...
Page 308: ...A 44 MS 890 Industrial Automation Scanner User Manual Glossary of Terms...