Checklists and Logs
Appendix D
Remove Conflat mounting screws.
Remove Conflat (with feedthrough attached).
Remove Helical coupling from feedthrough.
Unscrew feedthrough from Conflat flange.
Lubricate O-ring on new feedthrough. Gently tighten new
feedthrough to Conflat flange (use pliers with padded jaws).
Table 9-8 Replace Ferrofluidic Feedthrough
9.4.6.Replacing V-plate
Replacing V-plate Checklist
Remove dropping chamber cover.
Remove bottom drag-free cover from cart.
Detach LED bracket from cart and pull out of the way (be careful
not to damage wires).
Observe position of the threaded post attaching top drag-free cover
to cart.
9-14
Summary of Contents for FG5
Page 22: ...Design Components and Function 2 Figure 2 10 The Superspring 2 14 ...
Page 31: ...Design Components and Function 2 Figure 2 13 Rotation Monitor 2 23 ...
Page 32: ......
Page 42: ...How to Set Up and Run the FG5 3 3 10 ...
Page 44: ...How to Set Up and Run the FG5 3 Figure 3 2 V Post 3 12 ...
Page 53: ...How to Set Up and Run the FG5 3 1 Backup the data 2 Shut off computer power 3 21 ...
Page 87: ...Adjustment and Maintenance 4 4 29 ...
Page 91: ...Adjustment and Maintenance 4 4 33 ...
Page 104: ...Troubleshooting 5 5 2 ...
Page 117: ...Troubleshooting 5 5 15 ...
Page 131: ...Checklists and Logs Appendix D 9 3 ...
Page 140: ...Checklists and Logs Appendix D Table 9 6 Replacing Drive Belt 9 12 ...
Page 145: ...Checklists and Logs Appendix D Table 9 10 Replace Linear Bearings 9 17 ...
Page 149: ...Checklists and Logs Appendix D Table 9 13 Replace Shaft Encoder 9 21 ...