
Checklists and Logs
Appendix D
9.6.3.Removing Service Ring
Removing Service Ring Checklist
Unplug in-line connector (on electrical feedthrough) closest to
bulkhead.
Remove electrical feedthrough from service ring (note color coding
on connector).
Remove travel lock knob.
Remove travel lock assembly from service ring.
Remove service ring and bottom flange as a unit.
Table 9-17 Removing Superspring Service Ring
9.6.4.Replacing Coil
9-24
Replacing Coil Checklist
Remove service ring.
Remove base plate.
Lift rod assembly off bottom plate.
Summary of Contents for FG5
Page 22: ...Design Components and Function 2 Figure 2 10 The Superspring 2 14 ...
Page 31: ...Design Components and Function 2 Figure 2 13 Rotation Monitor 2 23 ...
Page 32: ......
Page 42: ...How to Set Up and Run the FG5 3 3 10 ...
Page 44: ...How to Set Up and Run the FG5 3 Figure 3 2 V Post 3 12 ...
Page 53: ...How to Set Up and Run the FG5 3 1 Backup the data 2 Shut off computer power 3 21 ...
Page 87: ...Adjustment and Maintenance 4 4 29 ...
Page 91: ...Adjustment and Maintenance 4 4 33 ...
Page 104: ...Troubleshooting 5 5 2 ...
Page 117: ...Troubleshooting 5 5 15 ...
Page 131: ...Checklists and Logs Appendix D 9 3 ...
Page 140: ...Checklists and Logs Appendix D Table 9 6 Replacing Drive Belt 9 12 ...
Page 145: ...Checklists and Logs Appendix D Table 9 10 Replace Linear Bearings 9 17 ...
Page 149: ...Checklists and Logs Appendix D Table 9 13 Replace Shaft Encoder 9 21 ...