3.1.2.1.Model AL-1 Laser:
3.1.2.1.1.Warm Up
•
Set the LOOP switch to the OPEN position.
•
Turn the switch on the laser controller to MANUAL.
•
DO NOT ADJUST THE COARSE GAIN KNOB.
•
Turn on the main power switch and the key switch for the laser tube
HV. Both lights on the laser controller panel should come on.
•
Set the heater current to 0.3 using the front panel monitor to view
current..
•
Allow the laser to warm up for at least half an hour before locking.
3.1.2.1.2.Operation
•
After the laser is warm, the LOOP switch should be closed.
•
The control switch should be set to REMOTE so that the computer can
control the red/blue side-lock choice.
3-3
Summary of Contents for FG5
Page 22: ...Design Components and Function 2 Figure 2 10 The Superspring 2 14 ...
Page 31: ...Design Components and Function 2 Figure 2 13 Rotation Monitor 2 23 ...
Page 32: ......
Page 42: ...How to Set Up and Run the FG5 3 3 10 ...
Page 44: ...How to Set Up and Run the FG5 3 Figure 3 2 V Post 3 12 ...
Page 53: ...How to Set Up and Run the FG5 3 1 Backup the data 2 Shut off computer power 3 21 ...
Page 87: ...Adjustment and Maintenance 4 4 29 ...
Page 91: ...Adjustment and Maintenance 4 4 33 ...
Page 104: ...Troubleshooting 5 5 2 ...
Page 117: ...Troubleshooting 5 5 15 ...
Page 131: ...Checklists and Logs Appendix D 9 3 ...
Page 140: ...Checklists and Logs Appendix D Table 9 6 Replacing Drive Belt 9 12 ...
Page 145: ...Checklists and Logs Appendix D Table 9 10 Replace Linear Bearings 9 17 ...
Page 149: ...Checklists and Logs Appendix D Table 9 13 Replace Shaft Encoder 9 21 ...